Service Hotline:
0574-27880858
Ningbo KPL Technology Co., Ltd.
Mr.Chen :18668299419
Mr.Huang :13056889909
Mr.Wang :15067891153
Miss Geng :15088816300
Miss Hu : 15906559403
Advice or complaint:0574-27880028
USA:+1 615 674 7606
10 . The CCC Certification Change
release time :2021-12-24 15:45:53
1 . Scope
This rule applies to the application in the authentication procedure and obtaining authentication of a certificate of the applicant , manufacturer name and address ,
production address and product name and model of key parts and etc .
2 . Certification of the type of changes
2 . Trademark change
2 . 2 due to the product naming method of variation of LICENSEE ' s Name , Model Change
2 . 3 Product Type changes , without affecting the electrical safety of the internal structure ( judged to be not related to safety and electromagnetic compatibility problems )
2 . Certificate 4 in added on the same products as the other models
2 . 5 in respect of the same products as the other reduced models
2 . 6 Change the name of manufacturer , address unchanged and the manufacturer was not relocated
2 . 7 Manufacturer name changes , name changes , the Manufacturer fails to relocation
2 . The manufacturer ' s name , address , name change , the Manufacturer fails to relocation
2 . 9 factory relocation
2 . 10 of the original name of the applicant and / or address change ,
2 . The original name of the manufacturer and / or address change ,
2 . Certification of 12 which serve as the basis for national standards , technique rules or authentication of the Detailed Rules for the Law of the People ' s Republic of China has changed
2 . 13 significantly affect the design and specification changed , such as structural or electrical safety certification of safety parts for replacement
2 . 14 to increase the applicability of consistent supplier of safe
2 . 15 , the factory changed ownership ( e.g . , an organization or manager changes )
2 . The other 16
3 . Application Procedures
3 . 1 The certificate holder shall carefully read the changes concerning the approval of the public file , fill in " Application for Modification of product certification ,
the factory must fill in the numbers , either online or written applications to the CQC relevant department proposes the change request . For a 2 . 1 - 2 . 16 of the
column of the approval , the holder of the permit to the Department of Product Certification / subcenter ' application .
3 . The holder 2 is provided in addition to the need for the Implementation of the certification application is changed , the original certificates / certificate original
copy of the form , he is also required to submit documents according to the following provisions apply :
3 . 2 . 1 2 . 1 - 2 . 4 Change of the condition , the changed new certificates such as original certificate information ( including model , trademarks ) , the holder of the
permit is needed to return the original certificate .
3.2 . 2 The 2 . 5 - 2 . 12 change conditions , the ship needed to return the original certificate .
3.2 . 3 The 2 . 1 changes to the conditions of the application shall be submitted to the new application for registration of a trademark or certification trademark use authorization .
3.2 . 4 2 . 2 - 2 . 4 changes to the conditions of the application shall be submitted to apply for a change after the names , models and the originally certified product name , model ,
differences between the statement ( in original ) .
3 . 2 . 5 2 . 4 changes to the conditions of the application shall be submitted to the new model with the originally certified product , discrepancy statement ( original ) .
3.2 . 6 2.5 . alter the conditions of the application shall be submitted to the reduced model of the formal description ( original ) .
3.2 . 7 conform to the 2 . 6 - 11 changes to the conditions of the application shall be submitted the following documents as applicable :
( a ) the superior competent department agreed to rename the existing location ;
( 2 ) Copy of Business License ;
( 3 ) local to the enterprise registration certificate issued by the institution ;
( 4 ) the address of the registration certificate issued by the institution ;
( 5 ) other documents should be submitted to the Board .
3 . 2 . 8 - 2 . 6 Change the conditions , if desired , be subjected to factory inspection .
3.2 . 9 The 2 . 7 to change the conditions , if desired , be subjected to factory inspection .
3.2 . 10 The 2 . 8 in order to change the conditions , shall be submitted to the local address of the issued certificates of registration shall be factory inspections .
3 . 2 . 11 conform to 2 . 9 change of conditions , shall be subjected to factory inspection . the holder of the approval to the product at the / branch proposes any change
of address of the application , by the inspection services , the Branch organized a factory inspection .
3 . 2 . 12 meeting the conditions of 12 changes , according to the CQC / QP . FDJS03 - 2002 " CQC certification requirements for the implementation of the procedures
of the United Nations Convention on the Law of the Sea .
3 . 2 . 13 - 2 . 13 changes to the conditions of the application shall be submitted to the manufacturer of the product design specification relating to the issue and change
the official statement of the ( original ) .
3.2 . 14 The 2 . 14 change of conditions , the application shall be provided with the safety member , the applicability of the proof .
3 . 2 . 15 meets the 2 . 15 changes to the conditions of the application shall be submitted to the manufacturer and issued by the quality change of the official statement ( original ) .
3 . 2 . 16 vehicle products according to the CQC / GD . CP03B - 2003 " vehicle certification change of Equipment " and submit the related data .
3 . 3 in the authentication process of change
in case of an authentication process but not yet obtained the authentication certificate of the application for the change , the CQC in receipt of the modification application
and the relevant information in accordance with relevant provisions after examination , to the associated detection mechanism and / or notification of a change notification
of the Joint Inspection Unit , JIU / detection mechanism according to the change notification of the request , issued after the change of test report / factory inspections .
The application for approval of a change of time , which is not included in the authentication time limit .
3 . 4 LICENSEE after change
The 2 . 1 - 2 . 5 , 2 . 10 - 2 . 14 change of conditions , the CQC products in receipt of the modification application and relevant materials according to relevant provisions
after review and , if necessary , to the relevant detection mechanism , detection mechanism according to the requirements for the Implementation of the Provisions of the
changing table and / or type test reports . 2 . 6 - 2 . 9 change of conditions , respectively , in accordance with 3.2 . 8 - 3 . 2 . 11 , the provisions of the factory inspection .
The assessment of conformity with the requirements , the CQC will be given to the licensee for such a change for the Implementation of the Provisions of the hair and / or a new certificate .
2 . 15 changes the conditions , if there is a need to carry out factory inspection , the CQC Product Certification section / branch that related information will be submitted
to the factory to the / branch inspection , factory inspection / branch center arrangement of the factory inspection , and reports the result to the / branch center product certification ,
the certification by the Engineer , fill in " for such a change , directly into conformity assessment stage .