6 . The CCC certification inspection factory when asked the

release time :2021-12-24 15:47:56    

First , as the QC Head is responsible for what ?

Answer : responsible for the establishment of the text file satisfies the quality system , and to ensure that in fact is and remains ;

The affix " JDC " moly resource will ensure that the product meets the certification requirements specified in standard ; and

establish documented procedures to ensure that appropriate certification certificate and mark correctly use and properly maintained ;

4 ) Establishing documented procedures and ensuring nonconforming products and certified products are not subjected to an authentication mechanism to confirm , are not posted with the voluntary certification marks ;

Second , what is meant by the coherence , consistency and which content ?

   Answer : consistency is the first to detect the authentication of the product ;

The consistency of the range are : Suppliers of consistent , parts of the model and specification are consistent , the product ' s label should be uniform , and the structure of the product should be in the same factory address should agree ;

Three , how to use the CQC mark ?

   The CQC logo , printed , in subsequent use for use in recording , the suspension , cancellation , and authentication is not within the scope of the CQC mark must not be used , but may not be used ;

IV . Handling of Unqualified Products

   Answer : the non - conforming products shall be identified ;

The non - conforming product rework , the reworked to be tested and qualified before qualified .

Five , what is called " periodic inspection confirmation " ?

      once a year to the Supplier for inspection report , or a third party out of the test report .

Six , what is called " validation test " ?

   A : The product provides a third party , whether to continue to view the product certification standards .

Seven , what is called " Operation Check " ?

   Answer : In the former , the first detection device to perform a calibration , if the operation fails to pass the inspection , the stack is performed in such a way that the maintenance verification only after being approved qualified .

Eight , what is meant by the " routine inspection "

   Answer : on the production line of 100 percent inspection and routine inspection is called .

Nine , the product of the national implementation of the standards is ( -Particular 1 - 2008 )

Ten , factories that fail to pass the check , apply for suspension of the certificate by the pause .

XI , CCC document resumes are in accordance with the Implementing Rule established ( documentation include : Quality Manual , procedure documents , inspection documents , regulations , specifications , etc . )

Twelve , including CCC certificate authentication file content , the type test report , factory inspection report on inspection confirmation report .

13 . Internal audit of his company ' s internal audit , in order to check whether the running of the factory quality assurance capability meets requirements , the own cannot review his or her own department .

XIV , Incoming inspection : inspection every time replenish onr ' s stock came 3 times .